Magazine Section Archives - Page 15 of 66 - Inside GNSS - Global Navigation Satellite Systems Engineering, Policy, and Design

Magazine Section

November 28, 2015

Stuart Riley’s Compass Points

Riley and his son, Ben.

Return to main article: Stuart Riley: Right Turn from the Wrong Path

COMPASS POINTS

Professional Path

Riley received a Ph.D. in electrical engineering at the University of Leeds (United Kingdom) where he then worked as a research fellow in 1994–5. After that, he joined Trimble Navigation Ltd. as a GNSS receiver designer. He is based in Sunnyvale, California, where since 2010 he has served as the company’s engineering director

Read More >

By Inside GNSS
[uam_ad id="183541"]
[uam_ad id="183541"]
November 19, 2015

Code Shift Keying

Equations 1 – 10

The constant growth and evolution of the positioning, navigation, and timing (PNT) market generate demands for more and more added-value applications and services relying on GNSS signals, with expectations for improved accuracy and availability. Some services may also rely on added-value content other than navigation messages, for example, higher data volume with less latency, such as the data carried by satellite-based augmentation system (SBAS) services and the Galileo Commercial Service.

Read More >

By Günter W. Hein

How Important Is It to Synchronize the Code and Phase Measurements of a GNSS Receiver?

Q: How Important Is It to Synchronize the Code and Phase Measurements of a GNSS Receiver?

A: Precise timing lies at the heart of GNSS implementation and operation and is generally well understood in terms of synchronizing individual satellites and/or receivers. Recent results, however, have demonstrated that timing of code and phase measurements in a receiver can have significant implications for the timing community in particular.

Read More >

By Inside GNSS
1 13 14 15 16 17 66
IGM_e-news_subscribe