200911 November/December 2009 Archives - Inside GNSS - Global Navigation Satellite Systems Engineering, Policy, and Design

200911 November/December 2009

November 4, 2009

Galileo Program Recalibrates Schedule, Budget, Open Signal ICD

Galileo IOV ProtoFlight Model under Assembly

Galileo program managers appear to have bowed to the unavoidable and acknowledged that completing the European satellite navigation system will take longer and cost more than their revised estimates of 2014 and  €3.4-billion ($5.04-billion), respectively

And, although a revised Galileo Open Service Signal-in-Space Interface Control Document (OS-SIS-ICD) will appear soon allowing manufacture and sale of Galileo equipment without a license, the ICD will still require a license for commercial use of the intellectual property contained in the document.

Read More >

By Inside GNSS
[uam_ad id="183541"]
IGM_e-news_subscribe