A: System Categories Archives - Page 53 of 199 - Inside GNSS - Global Navigation Satellite Systems Engineering, Policy, and Design

A: System Categories

December 18, 2017

GPS III RFP Delayed Again as GAO Underscores GPS Schedule Challenges

An additional delay in release of the GPS III RFP emerged just as federal watchdogs released a new report detailing the challenges Air Fore managers will face in keeping all the components of the modernization program on track.

The long-expected report from the Government Accountability Office looks at the overall effort to update GPS including developing a new ground system, more capable receiver cards for military equipment and new satellites to sustain and improve the constellation.

Read More >

By Inside GNSS
[uam_ad id="183541"]

Ariane 5 Mission with 4 Galileo Satellites set for Dec. 12 Liftoff

UPDATE: Today’s the day. Check back to the Inside GNSS website for updates on today’s launch.

A European Ariane 5 rocket followed dual rail tracks across the Guiana Space Center in South America on Monday on the way to its launch complex Monday, a day before today’s scheduled blastoff with four satellites to expand the Galileo navigation network. Also, you can follow the launch live at Spaceflight.com.

Read More >

By Inside GNSS
November 27, 2017

Fundamental Rethink for Galileo Commercial Service

At the lavish European Satellite Navigation Competition Awards Ceremony, we caught up with Carlo des Dorides, general director of the European GNSS Agency (GSA), who updated us on the status of the much-anticipated Galileo Commercial Service (CS).

“On the CS, we are dialoging extensively with EU member states, because there is a more and more consolidated view that there could be an advantage to providing the service for free,” des Dorides said.

Read More >

By Peter Gutierrez
[uam_ad id="183541"]

Ligado: Business and Network Plan Remain Unclear

A highly anticipated presentation by Ligado Networks to the nation’s leading satellite navigation experts took an unexpected turn when the company said it could not provide essential network information because it was looking to the government for technical direction and its business plans were still in flux.

Read More >

By Dee Ann Divis

Lockheed Martin Assembles Third U.S. Air Force GPS III Satellite

The GPS III SV03 fully assembled. Photo courtesy of Lockheed Martin.

The U.S. Air Force’s third GPS III satellite in production flow at Lockheed Martin’s advanced satellite manufacturing facility in Denver is now fully integrated into a complete space vehicle.

GPS III Space Vehicle 03 (GPS III SV03) followed the first two GPS III satellites on a streamlined assembly and test production line. Technicians successfully integrated the satellite’s major components – its system module, navigation payload and propulsion core – into one fully-assembled space vehicle on August 14.

Read More >

By Inside GNSS
November 22, 2017

Contest to Build 22 New GPS III Satellites Commences Dec. 7

Air Force Space Command announced Wednesday it will begin the next phase of its plan to buy another 22 GPS III satellites in two weeks.

The November 22 posting on Fed Biz Opps (fbo.gov) said the highly anticipated Request for Proposals (RFP) would be released on or about December 7. The contract for the new space vehicles is "planned as a single, predominantly Fixed Price Incentive-type contract awarded via full and open competition for production of 22 GPS III SVs."

Read More >

By Inside GNSS

Next Tranche of GPS Satellites to be called GPS IIIFs

The Global Positioning Systems Directorate, which is poised to launch its procurement of another 22 GPS III satellites, has given its next tranche of spacecraft a name.

"We are officially calling this GPS IIIF," Col. Gerry Gleckel, the Directorate’s deputy director, told the November meeting of the National Space-Based Positioning, Navigation, and Timing (PNT) Advisory Board. "Just as there was a IIF that was the follow-on for the GPS II’s, this is the follow-on for the GPS III."

Read More >

By Dee Ann Divis
1 51 52 53 54 55 199
IGM_e-news_subscribe