Optional Categories Archives - Page 19 of 28 - Inside GNSS - Global Navigation Satellite Systems Engineering, Policy, and Design

Optional Categories

SpectraTime Wins ESA Contract for New Space Maser

Neuchâtel, Switzerland–based SpectraTime, a member of the Orolia group, has received a €2.5-million research contract from the European Space Agency (ESA) to develop critical technologies for future space-qualified active maser, a critical component of the ACES (Atomic Clocks Ensemble in Space) scientific program.

Read More >

By Glen Gibbons
[uam_ad id="183541"]

Next JAMFEST Rescheduled to January 2009

The 746th Test Squadron (746 TS) will conduct its sixth JAMFEST, an innovative GPS jamming exercise at White Sands Missile Range (WSMR), New Mexico, in mid-January, 2009 — a rescheduling of the event that had been planned to take place next month.

JAMFEST programs are aimed at providing low-cost, realistic, GPS jamming scenarios for testing GPS-based navigation systems, as well as training personnel in unique GPS denied environments.

Read More >

By Glen Gibbons
[uam_ad id="183541"]

GPS Satellite Launch Schedule on “Indefinite” Hold

After a series of rescheduled launch dates, U.S. Air Force (USAF) officials have placed the final two GPS Block IIR-M satellites on “indefinite” status, pending the replacement of ordnance timers used in the Delta II launcher.

In a response to inquiries from Inside GNSS, spokespersons for the GPS Wing at the Space and Missile Systems Center, Los Angeles Air Force Base, and Launch and Range Space Wing said that “based on the parts production and qualification schedule, we project the GPS IIR launches will occur in Spring and Summer 2009.”

Read More >

By Glen Gibbons
September 25, 2008

Indra Team Begins Future EGNOS Study

Spain’s leading IT company, Indra, has begun a €1.5 million, 18-month project for the European Space Agency (ESA) to study the feasibility and definition of the European Geostationary Overlay Service (EGNOS) looking ahead towards a future multiconstellation regional system (MRS).

Read More >

By Glen Gibbons
1 17 18 19 20 21 28
IGM_e-news_subscribe